Phase spec — skeleton

Download the MarkdownSkeleton_Phase_Spec.md · 1.8 KB · from The delivery method

Headings and field lists only. Re-typed from the delivery SOP used on a sovereign OSINT platform built for a defence innovation challenge; no content from that or any other project.

Rules the skeleton enforces. Written before any code. Non-functional targets are declared now and measured live before sign-off. The evaluation floor is pinned before implementation; a missed floor is reported, never quietly absorbed. A spec is never written to justify work already done.

Status

One of: draft, approved for build · built, awaiting sign-off · signed off — with approver (role) and date. Never "complete" before sign-off.

Objective

Why the phase exists, framed for the end user.

Design decision · scope decision · model choice

  • Design decision: the key choice, named.
  • Scope decision: what is deliberately deferred, and why (recorded so it is not re-litigated).
  • Model or technology choice: what, and the reason.

What must be true — the contract

  • Interfaces
  • Data shapes
  • Validation rules
  • Acceptance criteria (each one falsifiable)

How it will be built

  • Components
  • Sequence of operations
  • Integration choices

Out of scope

What is recorded for later.

Non-functional targets

Target Numeric bar Scale it applies at Measured value (before sign-off)
Latency (percentile)
Throughput
Restart and replay integrity
Index coverage
Backpressure
Storage growth

Evaluation plan

Dataset Metric Floor (pinned now) Measured

Exit checks

The literal script run before sign-off. Each check names its mechanism. "Tests pass" is not an exit check.

Sign-off

Date · approver (role) · measured values · demo reference · tag.